It's been ages since my last post.
Work has been very busy and I never seem to have any free time.
I haven't had the time or space to work on the Indiana Jones project pin but now the spring is coming I am going to make time!
But first... I have decided to convert my garage into a games room. I have been thinking about converting the garage for about 5 years and never got round to it.
The Workshop
I had a dilemma. If I convert the garage into a games room I won't have a workshop, where do I keep the kids bikes and what about the garden tools and the lawn mower!
So I have bought one of these log cabins...
and one of these side stores...
The whole workshop will be 6.5 meters (including the 1.5 meter side store) by 3 meters.
I am off work next week so I am dedicating the whole week to the workshop project!
Saturday - Off to the Rugby - well maybe not the whole week!
Sunday- I will be clearing the ground for the workshop. The workshop is going in the top corner of the garden.
Monday - I will be finishing off the ground clearance, leveling etc.
Tuesday - The workshop is being delivered.
Wednesday - The mixer, compactor, 5 tonnes of hardcore, sand and gravel and 18 bags of cement is being delivered. Work on the base will start. I will hopefully be able to get the hardcore down and compacted.
Thursday - I will be mixing and laying the concrete base.
Friday - relaxing... hopefully... while the base is left to set.
Saturday - Rugby - Worcester Warriors vs Cornish Pirates
Sunday - Rugby - THREE games of rugby including the watching the England womens in the Six Nations.
The following weekend I will start work on assembling the log cabin as it all comes as individual planks! I always enjoyed playing with Lego so I am looking forward to this! :-)
The Games Room
I started to look at how I could convert the garage into a games room a few months ago.
I decided to break the work down into small manageable 'chunks' to make life easier.
The planned stages are as follows:-
- Replacing the rear window with French Doors.(so I can get pins in and out once 2 and 3 are complete!)
- Bricking up a side door.
- Bricking up the "up and over" garage doors (but leaving them on so there is no visible change from the front of the house.)
- Strengthen the roof joists so I can use the space for storage.
- Getting the power and lighting extended and fitted.
- Building an internal ~2M x ~3M – AV room (possibly)
- Installing a ‘loft’ hatch and ladder.
- Dry lining and insulating the walls and ceiling with Kingspan or similar.
- Adding additional insulation in the roof.
- Boarding the ‘loft’ floor.
- Fitting an over door heater (possibly Air Con)
- Putting in a suspended floor with under floor insulation.
- Decorating.
- Putting down a laminate floor.
- Playing pinball and drinking beer!
Work Started TODAY!! Stage 1 is complete!